Dell Networking Z9500 Manuel d'installation Page 30

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 42
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 29
Figure 11. Installing the Cable Management System for DAC Cables
1. Pin rack unit for DAC cable routing 2. Rack unit for DAC cable routing
2. Insert a cable in a Z9500 port. then route the DAC cables up and along the line-card face between
the larger pins directly above the card. Position the cables so they follow the channel marked in the
figure below and exit to the right or left, depending on the chassis slot location. The cables should
emerge from right and left side of the panel.
30
Z9500 Installation
Vue de la page 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 41 42

Commentaires sur ces manuels

Pas de commentaire