Dell OpenManage Network Manager Version 5.0 Guide de l'utilisateur Page 330

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 380
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 329
330 Compliance and Change Reporting | Change Management / ProScan
You can also run the Change Determination Report that displays changes made to configurations.
See
Reports on page 200
for more about reporting capabilities.
The Change Determination Report report displays detected changes based on a configuration
change flag set when OpenManage Network Manager detects a change made to the device. To
successfully execute this report, you must enable a scheduled Change Determination Process. The
process must run before the reports has any contents. To run the process, go to the Schedules
portlet, and schedule that change determination process.
Reporting Limitations
The Configuration Change Report only reports on incremental configuration changes discovered
in the CD process. Simply making changes to configurations and backing them up in OpenManage
Network Manager does
not
ensure these appear in
Configuration Change Reports
. They appear in
reports only after running the CD process.
Vue de la page 329
1 2 ... 325 326 327 328 329 330 331 332 333 334 335 ... 379 380

Commentaires sur ces manuels

Pas de commentaire