Dell Active Fabric Manager Guide de l'utilisateur Page 15

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 179
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 14
Selecting a Layer 2 VLT and Layer 3 with Resiliency (Routed VLT) Fabric Design
3. Build the physical network.
4. Configure the following settings:
TFTP/FTP
SNMP
CLI Credentials
5. Prepare the Fabric for Deployment
6. Deploy and Validate the Fabric
7. Validate the deployed fabric against the fabric design.
8. Monitor the fabric health and performance. See Performance Management.
NOTE: To provision the fabric, enter the Dell Networking operating system (FTOS) CLI user’s Credentials and
enable the configuration credential for all the switches in the fabric. For information about this topic, see CLI
Credentials.
CAUTION: If you are using a switch that has already been deployed, reset its factory settings in the fabric. The
switch must be in Bare Metal Provision (BMP) mode.
Designing and Deploying a Fabric Flowchart
The following flowchart shows how to design and deploy a new fabric.
Figure 2. Capacity Planning
15
Vue de la page 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 178 179

Commentaires sur ces manuels

Pas de commentaire